If customers wish to separate their metering location so as to have two metering points instead of one, they are required to file BSP-1 form (Request for consent for connecting a customer to the distribution grid - MKAX001) and to attach the required documents with the competent CEC (Customer Electricity Center), any business day from 7.30 to 15.30 hrs.
*Separation of metering upon separation of the installation is only done in the event if the approved maximum simultaneous power capacity at the current metering point is equal to or higher than 24 kW. The applicant is required to install the power supply cable from the meters to the building.
Pursuant to the legal provisions, Elektrodistribucija DOOEL is the sole entity responsible for separating a single metering point.